ENGLISH |  繁體 |  简体
Our Services & Experience > Fit-out Works > The Venetian Macao

The Venetian Macao Resort is the First Integrated Resort in Macao. As one of Asia’s most exciting entertainment destinations, it is the second largest building in the world with a total floor area of 1,000,000 m2

From year 2004 onwards, we successfully delivered numerous project works at the Venetian Macao Resort, including site formation, piling, substructure, architectural finishes, hard landscaping, ABWF and interior fitting-out works.

We were involved in this mega project from the commencement of construction in June 2004 until the opening of the resort in August 2007. And to date, we continue to hold tight cooperation and collaboration with the our client to strive for the development for The Venetian Macao Resort.

Employer: Venetian Cotai Limited
Project Name: 9215 – Family Friendly Entrance & Family West Corridors
Project Date: August 2008 – January 2010

The Works comprises the design, engineering, fabrication, supply, delivery to site, erection, installation, testing, commissioning and protection for the construction and completion of interior fitting out works at the Podium Level 1 F+B outlet (1&4) – Venetian Noodle Restaurants including the associated BOH kitchens for Cotai, Parcel 5&6 (Resumption) & Tropical Gardens.

Employer: Venetian Cotai Limited
Project Name: Package No. : WP5271 – Podium L1 BAMBU Restaurant Fit Out and MEP Works
Project Date: May 2007 – Early July 2007

Employer: Venetian Cotai Limited
Project Name: Package No. : C07-0236/7.01/FC1 – Internal Fitting Out Works to Food Court at 3/F of the Grand Canal Shoppes
Project Date: July 2007 – September 2007

Employer: Eclipse
Project Name: Package No. : 1038 – Internal Fitting Out Works and associated M&E Works (Main Contractor) for McSorley’s Ale House at the Venetian, Macau
Project Date: May 2007 – Early July 2007

Employer: Choi Heong Yuen Bakery, Macau
Project Name: Unit 2130a – Fitting Out Works and Professional Services for Choi Heong Yuen Bakery Fit-out at Venetian Macau in Cotai, Macau
Project Date: Early July 2007 – Early Dec 2007

Employer: Venetian Cotai Limited
Project Name: Package No. : WP9210 & 9220 – Podium ABWF Works and Podium Fit-out Works (FOR POST OP)
Project Date: May 2007 – January 2010

Employer: Venetian Cotai Limited
Project Name: 5257 – Podium Long House and Central Circulation (West) Ceiling Fit-Out and Red Dragon Ceiling Fit-out
Project Date: September 2006 – June 2007

The Venetian Macao casino resort hotel complex consists of casino and retail space in a podium of five levels, a hotel of forty storeys, a congress hall, etc. with a total construction area in the range of one million square metres. The construction work of this Package is the supply and installation of a complete ceiling for Long House Central Circulation (West), Red Dragon area ceiling fit-out.

Employer: Venetian Cotai Limited
Project Name: 4270 – Podium FOH Retail / F&B Drywall
Project Date: July 2006 – 28 August 2007

The Venetian Macao Cotai Development consists of several enormous and fast track complex projects which include Expo, Energy Centre, Event Centre, Pool Deck, Podium and Hotel Tower. The construction work of this Package is the Podium FOH Retail / FOH Drywall for the Venetian, Cotai, Macao and the target completion date is February 2007.

Copyright (C) 2017 Min Da Construction & Engineering Company Limited. All Rights Reserved. Web Designed by Newsbook Ltd.
Home | About Us | Our Services & Experience | Plants & Equipment | Recruitment | Contacts