As an expert in high-end fit-out contractor/ABWF and builders works, Min Da have been a long time main contractor for our clients The Sands China Ltd. to provide fit-out services to The Sands Macao, The Venetian Macao, Sands Cotai Central, The Parisian Macao and Marina Bays Sands.
Min Da has been awarded a number of A&A contracts after the opening of the above hotels and casino. The extensive experience in A&A works guarantee us better understanding and cooperation with all counterpart in the services we deliver, thus, better serves our clients' need.
Employer: Venetian Cotai Limited
Project Name: 972650 - VHM Rooms Conversion (ABWF/ Fit-out/ MEP)
Project Date: Feb 2016 – Dec 2017
The Venetian Macao Hotel Resort is the First Integrated Resort in Macao, providing spacious rooms and luxurious accommodation experience to all of its visitor.
Min Da is awarded the VMH Rooms Conversion project in 2016, which includes the fitting-out and renovation works to the Hotel Suites, Lift Lobbies, and Corridors at The Venetian Macao Hotel Resort. And total construction works cover 2,840 nos. of hotel rooms.
Employer: Venetian Cotai Limited
Project Name: WP924140 - Four Seasons Hotel Rooms (ABWF/ Fit-out/ MEP)
Project Date: Oct 2016 – Dec 2017
The Works refer to the provision of ABWF, Fit-out, MEP/ ELV and access works in connection with the design, supply, installation and renovation of the Four Seasons Room Renovation project, which includes 360 numbers of Rooms, Suites, Lift Lobbies and Corridors from Level 6 to Level 19 of Four Seasons Hotel, Macao.
Employer: Venetian Cotai Limited
Project Name: WP973240 - P1 Paiza Junket Conversion
Project Date: Oct 2016 - Jan 2017
The Works includes all demolition, design, provision of ABWF, Fit-out, MEP/ELV and access works to the existing the Parcel 1 Paiza Junket Conversion at the Venetian Paiza.
Employer: Venetian Orient Limited
Project Name: WP958520 - SCC Himalaya Casino Entry (Demolition / Fit-out / MEP)
Project Date: May 2016 - Sep 2017
Employer: Venetian Cotai Limited
Project Name: WP923750 - Parcel 2 Major Retail Mall Enhancement - ABWF & Fit-out Works
Project Date: Feb 2014 - Oct 2014
The Works comprises design, supply and installation of ABWF and Fit-out Works for Major Mall Enhancements at The Venetian Macao Resort Hotel. This includes the implementation of a complete finished envelope with ceilings, walls, neutral pier, columns, floors and guardrails in order to facilitate the proper functioning of the space as a FOH retail mall, corridors and circulation space, and BOH areas.
Employer: Venetian Cotai Limited
Project Name: WP915651 - P1 Portofino Rotunda Al Fresco Dining Phase 1
Project Date: April 2013 - September 2012
The works includes the supply and installation of fitting out works, various modification and alteration works, including but not limited to floor, wall and ceiling finishes at P1 Portofino Al Fresco Dining.
Employer: Venetian Orient Limited
Project Name: WP951421 - L39 & L40 East Tower Suites
Project Date: August 2013 - January 2014
The scope of the Works comprises, design, supply, and installation of SCC L39-L40 East Tower of Conrad Hotel includes but not limit to FF&E, and fit-out, all as detailed and in accordance with the trade contract.
2-Bay Suite
8-Bay Suite
Board Room
Lounge & Buffet Area
Reception
Employer: Venetian Cotai Limited
Project Name: Wp911705 – Family Friendly Screens and Pathway for the Venetian Parcel 1 & 2
Project Date: July 2011 – September 2011
The Works comprises Supply, fabricate, installation of the Family Friendly Screens and modification of the existing casino areas to Family Friendly Pathway for the Venetian Macao. The complexity of this project is that all works are carried out in a 24-hrs operated Casino and without affecting our Clients.
The Casino Screen
The Marble Floor
The Retail
The Temp. Terrace Wall